Windermere Water Master Plan Report
Windermere Water Master Plan (North, Central, & South Phases) – The drivers for this project are safety, environmental protection, and reliability. This project will improve safety by providing a monitored, safe drinking water supply and by improving fire protection capabilities. This project will protect the environment by reducing the number of wells around the Town’s Outstanding Florida Waterbodies. This project will improve reliability by providing a pressurized system that does not require electricity to operate residential well pumps.
Wastewater Study – The Town of Windermere is surrounded by Florida Outstanding Water Bodies. Over 80% of the homes both lake front and in the lake basins are on septic. The Town would like to study how to bring in a centralized wastewater system and how this infrastructure would improve the lakes water quality.
Support This Project
UPDATE: The Florida State Legislature has approved $3,081,000 in state funds for the Central Potable Water Project and another $375,000 in state funds for the requested Wastewater Study.
The Town has submitted Appropriation Requests to the State of Florida to obtain funding for all thee phases of the Water Master Plan, as well as the Wastewater Study. Send support letters to your legislators! Download and fill out the documents below, and mail or email to your legislator. For Windermere residents, Carolina Amesty is your representative and Dennis Baxley is your senator.
2023 Water Master Plan Resident Letter Rep. AMESTY
2023 Water Master Plan Resident Letter Sen. BAXLEY
2023 Water Master Plan Letter GENERIC
2023 Wastewater Study Resident Letter Rep. AMESTY
2023 Wastewater Study Resident Letter Sen. BAXLEY
2023 Wastewater Study Letter GENERIC