Public Notice
Docs and Files
Bessie Plan Exhibits
Bessie Typical Exhibits
Bessie Plan Exhibits (updated 10/2020)
Bessie Plan Exhibits (updated 11/2020)
Bessie Concept
Bessie 45% Plans (updated 7/2021)
Bessie with 3rd and Magnolia Drainage Improvements 45% Plans (updated 7/2021)
Bessie with 3rd and Magnolia Drainage Improvements 45% Plan Exhibits (updated 7/2021)
WATCH Bessie 45% Plans Public Workshop
Bessie with 3rd and Magnolia Drainage Improvements 45% Plans (updated 8/2021)
Bessie with 3rd and Magnolia Drainage Improvements 45% Plan Exhibits (updated 8/2021)
Bessie Permit Plans (updated 11/2021)
Bessie Drainage Report (updated 11/2021)
Exhibit – Bessie St. Landscape Plan (12/2021)
Bessie and 3rd Plan Exhibits (12/2021)
Bessie Plans 90% Plans (12/2021)
Bessie Street Water Main Plans 90% (12/2021)
Bessie Street Drainage Improvements Phase I
Bessie Street Drainage Improvements Phase II
WATCH Town Manager Smith do a project concept walkthrough Part I
WATCH Town Manager Smith do a project concept walkthrough Part II
WATCH Town Manager Smith do a project concept walkthrough Part II
Timeline
- Additional survey – 3/01 – 3/22/2021
- 45% Design Plans – 2/22 – 4/30/2021
- Public Involvement Workshops and TC meeting – 5/03 – 6/08/2021
- Geotech, utility test holes, survey to pick up test holes – 6/09 – 6/23/2021
- Final Design Drainage Plans and Water Main Plans – 6/09 – 8/09/2021
- Permitting – 6/09 – 9/09/2021
- Public Involvement and TC meeting – 8/10 – 9/14/2021
- Bid Plans – 9/15 – 10/15/2021
- 90% Workshop – 12/2/2021
- Utilities test hole dig – first week of January 2022